| A 10.5 km road from
Gan to Hithadhoo in the SDR will be constructed. The main
requirement is the procurement of
appropriate filling materials (to be sourced from the
dredging for the port expansion). The road alignment will follow the
eastern lagoon side
of the island chain with a minimum standard of not less than 7.4
meter crowned
surface with appropriate drainage. The physical infrastructure
component will
include the purchase of equipment for road maintenance units in the
NDR (Kulhuduffushi)
and SDR (Hithadhoo). Provision will also be made for restoration of
the street surfaces in each of the
built-up areas and for appropriate drainage. Location and
construction of infrastructure under the Project will follow the
Bank's Environmental
Guidelines for Selected Infrastructure Development Projects. |
| |
|