Regional Development Project, Phase 1
  
Home  |  Project Summary  |   Site Map  |  Contact
Guest Book  |  Webmaster  |   Search
 
 
Project Description
The Project Scope
Institutional Improvements
Social Infrastructure
Physical Infrastructure
Environmental Management
Land Use Planning
The Project Area
Project Implementation
Consulting Service
Procurement
  

Map of Maldives

 

Physical Infrastructure
 
A 10.5 km road from Gan to Hithadhoo in the SDR will be constructed. The main requirement is the procurement of appropriate filling materials (to be sourced from the dredging for the port expansion). The road alignment will follow the eastern lagoon side of the island chain with a minimum standard of not less than 7.4 meter crowned surface with appropriate drainage. The physical infrastructure component will include the purchase of equipment for road maintenance units in the NDR (Kulhuduffushi) and SDR (Hithadhoo). Provision will also be made for restoration of the street surfaces in each of the built-up areas and for appropriate drainage. Location and construction of infrastructure under the Project will follow the Bank's Environmental Guidelines for Selected Infrastructure Development Projects.